Handing over the keys to a new building is an exciting time for a building owner, the occupants, and for Delta Design Systems. This is where we close the planning, design and construction loop.


Delta Design Systems Custom Building

 

 

Prior to breaking ground we begin planning the systems and processes that will maximize the utility and efficiency of your building. We design spaces, floors, walls, roof structures, doors, windows, mechanical systems, electrical systems and fixtures. When construction begins, our crews translate lines on paper into structures of steel and brick. But when Delta Design Systems hands you the keys to your new building, our work is not done. No project is complete until you, the owner, say it's complete.

 

 

 

 

 

 

 Delta Design Systems Special Use Building

 When we hand you the keys, we do a comprehensive building orientation with you. We provide proper training in operating and maintaining your building's systems. We make sure your drawings show notes where there have been changes to the building plan during construction. It should be noted that changes are rare because our planning and design process is so thorough. We provide manuals and warranties for your building's components. Post-occupancy, we provide follow-up inspections during the first year to assure client satisfaction. Finally, we certify that all contract agreements have been completed.

But our service to you doesn't stop there. When you have the keys to your new building, you also have the Delta Design Systems Advantage:

  • Assistance through the first year in your new building
  • One source for experts on your building
  • A custom solution to your specific building needs
  • Substantial cost savings by eliminating multiple layers of planning, design and construction fees
  • Time savings by having all the players on the same team
  • A building that will serve you well for many, many years
 

This Week

A 20,000 square foot building addition is complete at Mann Metal Finishing in Hartford. The new space will be used for warehousing and includes restrooms, offices and a break room.

 

Fema Corporation in Portage is expanding. Delta Design Systems is providing a 34,000 square foot addition to accomodate their growth. The building has been erected and we are making daily progress with the finish work and the mechanicals.  

 

A 5000 square foot storage building is being constructed for McDonalds Towing in Kalalmazoo. The building is nearing completion.

 

Parma Tube, Inc. in Sturgis is adding a truck dock addition to their factory. The addition will allow indoor loading and un-loading and will feature an overhead crane to distribute product. The building process is going smoothly and we should have the dock in operation in a few weeks.

 

 

Photos

Check out our

Photo Gallery!

Who's Online

Delta Design Systems Inc.  
8240 Stadium Drive                      Phone 269.353.7800
Kalamazoo, MI 49009                    Fax 269.353.7900
 ©2007 Delta Design Systems  Inc.